Delivery State:
Price is per lineal metre and includes GST
Which fasteners do I use to install this capping?
Ridge capping is held in place using 12 x 50 roofing screws every second corrugation.
What roof pitch does this ridge capping suit?
This capping is best suited to a 22.5 degree roof pitch, and can flex up to 5 - 10 degrees
How long does delivery take?
Delivery takes approx 3 - 4 working days.
How do I install this roll top ridge capping?
Please see our installation video below.
We use only the best 100% Australian steel for 100% peace of mind; made from BlueScope’s industry-leading brands such as COLORBOND® and ZINCALUME® steel. And, of course, all our products are extensively performance tested, backed with the strength of the BlueScope warranty and can be relied on with total and absolute confidence.
Compliments any corrugated roof.
This attractive ridge capping keeps in line with the curved profile of corrugated roof sheets.
Our Rolltop provides clean straight lines and is extremely strong.
What type of screws do I use to install the roll top ridge capping?
Ridge capping is held in place using 12 x 50 roofing screws every second corrugation.
Do you have a question? Why not call us on 1300 886 944 or email us HERE