Delivery State:
Price is per lineal metre and includes GST
Which fasteners do I use to install this capping?
Ridge capping is held in place using 12 x 50 roofing screws every second corrugation.
What roof pitch does this ridge capping suit?
This capping is best suited to a 22.5 degree roof pitch, and can flex up to 5 - 10 degrees
How long does delivery take?
Delivery takes approx 3 - 4 working days depending on location.
How do I install this roll top ridge capping?
Please see our installation video below.
We use only the best 100% Australian steel for 100% peace of mind; made from BlueScope’s industry-leading brands such as COLORBOND® and ZINCALUME® steel. And, of course, all our products are extensively performance tested, backed with the strength of the BlueScope warranty and can be relied on with total and absolute confidence.
.